220/33kv Grid station for Transco. Comprised of a secured compound with 220kV control building, 220kV GIS building, 33kV switchgear & control building, 90/120mVA transformer and fire pump room.
Scope of work included detailed design and construction drawing package for Site development, architectural, structural, plumbing system, fencing and exterior works. Coordination and As-built drawings are issued to L&T contractor.